Two AE94.2 units at a combined cycle plant required hot-gas-path components ahead of a planned outage. AOGC identified the items from nameplate and part-number data, confirmed OEM equivalence and material specification, and supplied the components with full certification.
The scope was extended to a combustion inspection during the same outage, which allowed the parts recommendation to be revised against actual condition before the second unit was opened.
